Summary for Test 2021-10-20-22-6
Test performed: AASHTO T304-11Project Information
Project Identifiers | Project ID: 215148 DEA: 081E8404 EFIS: 0814000113 |
---|---|
DIST-CO-RTE-PM | 08-RIV,SBD-62-R6.7/9.2,0.0/15.1,29.3/33.6 |
Award Date | 12/11/2020 |
Closeout Date | 03/01/2023 |
Work Description | REPLACE ROADWAY WITH RHMA-G AND HMA. |
Location Description | IN RIVERSIDE AND SAN BERNARDINO COUNTIES IN AND NEAR YUCCA VALLEY AND IN TWENTYNINE PALMS FROM 0.2 MILE NORTH OF INDIAN CANYON DRIVE TO 0.6 MILE WEST OF UTAH TRAIL |
QA Service Level | 1 (Verified on 03/18/2021) |
Sample Information
Sample Taken Date | 10/20/2021 | Sample Unique Key | 22 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/21/2021 |
Sample type | Verification | A brief description of the sample | PSUE 3/4" RHMA-G-SP 0.5% LAS |
The quantity of what the sample constitutes | 4 Bags of Aggregate | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Matich Cabazon | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0599G-21 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Matich Cabazon | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA or name of Pit) | 91-36-0040, 91-33-0008 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | 3/4 RHMA-G-SP | The fabricator/manufacturer designation for the sample | |
The plant number | CHP 68E | A detailed description of where the material sample was collected | Belt Cut at Matich Cabazon Plant |
Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-10-20-22
DIME Test ID: 2021-10-20-22-6
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T304-11: Standard Method of Test for Uncompacted Void Content of Fine Aggregate (Fine of Crushed Particles)
Test Release Date: 2021-10-27
Test Results
What test method is performed?: Method A
Input Type: Calculated
Tester's full name: Michael Magana
Date of test: 10/26/2021
Bulk dry specific gravity: 2.639
Average uncompacted voids: 47.2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/27/2021 ✔