Summary for Test 2021-08-20-59-1
Test performed: AASHTO T27-14Project Information
Project Identifiers | Project ID: 214114 DEA: 040A5394 EFIS: 0418000244 |
---|---|
DIST-CO-RTE-PM | 04-SOL-80,12-11.4/12.8, 2.1/2.8 |
Award Date | Not set |
Closeout Date | 02/24/2023 |
Work Description | Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc. |
Location Description | I-80/I-680/Route 12 Interchange |
QA Service Level | 1 (Verified on 04/23/2019) |
Sample Information
Sample Taken Date | 08/20/2021 | Sample Unique Key | 59 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 08/20/2021 |
Sample type | Verification | A brief description of the sample | 4 Bags of Mixed Aggregate |
The quantity of what the sample constitutes | 4 Bags | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Nick | Last name of sampler or witnessed by | Hall |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Syar Vallejo | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-48-0002::LAKE HERMAN QUARRY |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Plant QC | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-08-20-59
DIME Test ID: 2021-08-20-59-1
Testing Lab: CT D04 - Hayward DME / District Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2021-10-06
Test Results
What type of gradation is being tested?: HMA Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: Nicholas Shelly
Date of test: 09/01/2021
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 97.6 %
Cumulative percent passing the 1/2 in. sieve: 82.8 %
Cumulative percent passing the 3/8 in. sieve: 71.7 %
Cumulative percent passing the #4 sieve: 45.6 %
Cumulative percent passing the #8 sieve: 28.4 %
Cumulative percent passing the #16 sieve: 17.5 %
Cumulative percent passing the #30 sieve: 11.1 %
Cumulative percent passing the #50 sieve: 7.2 %
Cumulative percent passing the #100 sieve: 4.6 %
Cumulative percent passing the #200 sieve: 3.2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/6/2021 ✔