Summary for Test 2021-09-17-26-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215224 DEA: 080F5444 EFIS: 0818000209 COOP: 081714 |
---|---|
DIST-CO-RTE-PM | 08-RIV-91-17.4/18.9 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Operational and safety improvements by constructing a portion of the Ultimate SR?91 CIP Project on WB SR?91 from Green River Road to SR?241 to alleviate traffic congestion in this area (ORA Post Mile R17.4 to R18.9, RIV Post Mile R0.0 to R0.6). |
Location Description | The 91 COP consists of the following project components: adding a general purpose (GP) lane approximately 2 miles in length in the WB direction on SR?91 from Green River Road to SR?241. |
QA Service Level | 2 (Verified on 09/18/2020) |
Sample Information
Sample Taken Date | 09/17/2021 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/27/2021 |
Sample type | Verification | A brief description of the sample | PG Asphalt Binder |
The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
First name of sampler or witnessed by | RMA Group | Last name of sampler or witnessed by | RMA Tech |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0551-21 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | AAA-Corona | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Asphalt Binder Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-09-17-26
DIME Test ID: 2021-09-17-26-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-09-28
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 09/28/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 166.197 grams
Mass of empty container #2: 169.386 grams
Mass of container #1 before test (m1i): 200.767 grams
Mass of container #2 before test (m2i): 204.149 grams
Mass of container #1 after test (m1f): 200.726 grams
Mass of container #2 after test (m2f): 204.105 grams
Average mass change: -0.123 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/28/2021 ✔