Summary for Test 2021-09-17-16-9

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 214586
DEA: 081H7704
EFIS: 0817000132
DIST-CO-RTE-PM08-SBD-215-4.5/5.8
Award Date06/10/2020
Closeout Date05/26/2022
Work DescriptionINSTALL SIGN STRUCTURE, HMA, MODIFY RAMP METERING AND RETAINING WALL.
Location DescriptionSAN BENARDINO COUNTY IN SAN BERNARDINO FROM 0.5 MILE SOUTH OR ORANGE SHOW ROAD/AUTO PLAZA DRIVE OVERCROSSING TO 0.2 MILE NORTH OF INLAND CENTER DRIVE OVERCROSSING
QA Service Level1 (Verified on 04/16/2020)

Sample Information

Sample Taken Date09/17/2021 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/20/2021
Sample typeVerification A brief description of the samplePSUE 3/4" HMA-A-SP R15 No LAS
The quantity of what the sample constitutes2 Bags of Combined Aggregate, 2 Bags RAP From where was the sample collectedManufacturer
First name of sampler or witnessed byCedro Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification0538A-21 Linked DIME Sample ID
The fabricator/manufacturer/facility nameAll American Asphalt - Corona Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-33-0005
The fabricator's/manufacturer's product name for the sample3/4 HMA-A-SP R15 The fabricator/manufacturer designation for the sample
The plant number105927 A detailed description of where the material sample was collectedBelt Cut at All American Corona Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-09-17-16
DIME Test ID: 2021-09-17-16-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-09-27

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Satish Jain
Date of test: 09/23/2021
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 98 %
Cumulative percent passing the 3/8 in. sieve: 93 %
Cumulative percent passing the #4 sieve: 72 %
Cumulative percent passing the #8 sieve: 53 %
Cumulative percent passing the #16 sieve: 41 %
Cumulative percent passing the #30 sieve: 31 %
Cumulative percent passing the #50 sieve: 21 %
Cumulative percent passing the #100 sieve: 14 %
Cumulative percent passing the #200 sieve: 10 %
General comments (publicly viewable) (Max 1000 characters): Rap Gradation After Ignition

Test was verified on 9/27/2021