Summary for Test 2021-08-20-53-10

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 214114
DEA: 040A5394
EFIS: 0418000244
DIST-CO-RTE-PM04-SOL-80,12-11.4/12.8, 2.1/2.8
Award DateNot set
Closeout Date02/24/2023
Work DescriptionWiden EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.
Location DescriptionI-80/I-680/Route 12 Interchange
QA Service Level1 (Verified on 04/23/2019)

Sample Information

Sample Taken Date08/20/2021 Sample Unique Key53
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing08/20/2021
Sample typeVerification A brief description of the sample4 Bags of Mix Aggregates
The quantity of what the sample constitutes4 Bags From where was the sample collectedManufacturer
First name of sampler or witnessed byTarech CA Last name of sampler or witnessed byCA
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSyar Indunsties Lake Herman Batch Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-48-0002::LAKE HERMAN QUARRY
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedSyar Vallejo
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-08-20-53
DIME Test ID: 2021-08-20-53-10
Testing Lab: CT D04 - Hayward DME / District Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2021-09-22

Test Results


How many times will the test be run?: 3 Times
Input Type: Calculated
Tester's full name: Nicholas Shelly
Date of test: 08/31/2021
Sand Equivalent (Test 1): 62
Sand Equivalent (Test 2): 64
Sand Equivalent (Test 3): 61
Sand Equivalent: 63
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/22/2021