Summary for Test 2021-09-08-7-1

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 215161
DEA: 010C5704
EFIS: 0113000009
DIST-CO-RTE-PM01-HUM-101-69.8/75.2
Award Date11/09/2020
Closeout Date04/04/2022
Work DescriptionPLACE RHMA-G, HMA AND CONCRETE BARRIER.
Location DescriptionHUMBOLDT COUNTY IN AND NEAR EUREKA FROM 0.8 MILE SOUTH OF TOMPKINS HILL ROAD OVERHEAD TO 0.4 MILE NORTH OF HERRICK AVENUE OVERCROSSING
QA Service Level1 (Verified on 09/15/2020)

Sample Information

Sample Taken Date09/08/2021 Sample Unique Key7
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/13/2021
Sample typeAcceptance A brief description of the samplePG64-16
The quantity of what the sample constitutes1 can From where was the sample collectedManufacturer
First name of sampler or witnessed byJohn Last name of sampler or witnessed byAtturo
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMercer Fraser Plant B Transportation Laboratory (TL) Numberc972624
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
ModifiedNo Lot number1
Sublot number1 Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierValero Marketing & Supply - Benicia CA MultigradeNo
Multigrade Type Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2021-09-08-7
DIME Test ID: 2021-09-08-7-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-09-24

Test Results


Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 09/15/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 174.393 grams
Mass of empty container #2: 172.625 grams
Mass of container #1 before test (m1i): 209.870 grams
Mass of container #2 before test (m2i): 209.053 grams
Mass of container #1 after test (m1f): 209.711 grams
Mass of container #2 after test (m2f): 209.902 grams
Average mass change: 0.941 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs

Test was verified on 9/24/2021