Summary for Test 2021-08-25-37-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215615 DEA: 101L2304 EFIS: 1020000163 |
---|---|
DIST-CO-RTE-PM | 10-SJ-4-5.4/13.4 |
Award Date | 05/05/2021 |
Closeout Date | 01/31/2022 |
Work Description | COLD PLANE ASPHALT CONCRETE PAVEMENT AND RESURFACE WITH HMA AND RHMA. |
Location Description | SAN JOAQUIN COUNTY NEAR STOCKTON FROM 1 MILE EAST OF MIDDLE RIVER BRIDGE TO 0.1 MILE WEST OF JOHN TURK ROAD |
QA Service Level | 1 (Verified on 04/21/2021) |
Sample Information
Sample Taken Date | 08/25/2021 | Sample Unique Key | 37 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/07/2021 |
Sample type | Department Acceptance | A brief description of the sample | Asphalt Rubber Binder |
The quantity of what the sample constitutes | 1 of 2 cans | From where was the sample collected | Job Site |
First name of sampler or witnessed by | J | Last name of sampler or witnessed by | Kort |
Title of sampler | CONSTR INSP | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | George Reed - Clements Plant | Transportation Laboratory (TL) Number | C035044 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
---|---|---|---|
Modified | No | Lot number | 1 |
Sublot number | 1 | Tank number | |
Time of sample | HMA Supplier | George Reed - Clements | |
Certified Asphalt Supplier | VSS Emultech - West Sacramento CA | Multigrade | Yes |
Multigrade Type | PG 64-16 / PG 64-10 | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-08-25-37
DIME Test ID: 2021-08-25-37-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-09-20
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 09/14/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 173.736 grams
Mass of empty container #2: 169.465 grams
Mass of container #1 before test (m1i): 209.036 grams
Mass of container #2 before test (m2i): 205.027 grams
Mass of container #1 after test (m1f): 208.823 grams
Mass of container #2 after test (m2f): 204.848 grams
Average mass change: -0.553 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs
Test was verified on 9/20/2021 ✔