Summary for Test 2021-08-30-37-2
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 215393 DEA: 021J5104 EFIS: 0220000086 |
---|---|
DIST-CO-RTE-PM | 02-LAS,MOD-139-57.0/66.635,0.0/0.1 |
Award Date | 02/10/2021 |
Closeout Date | 11/24/2021 |
Work Description | PERFORM COLD IN-PLACE RECYCLING AND PLACE HOT MIX ASPHALT (TYPE A). |
Location Description | LASSEN AND MODOC COUNTIES NEAR ADIN FROM 4.5 MILES SOUTH OF COUNTY ROAD A2 TO 0.1 MILE SOUTH OF ROUTE 299 |
QA Service Level | 1 (Verified on 01/07/2021) |
Sample Information
Sample Taken Date | 08/30/2021 | Sample Unique Key | 37 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/31/2021 |
Sample type | Department Acceptance | A brief description of the sample | 1/2 inch HMA A 25 RAP PG58-34M Albina |
The quantity of what the sample constitutes | PSE 16 Boxes at 286 Tons | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | E | Last name of sampler or witnessed by | Chavez |
Title of sampler | Materials Tester | Telephone number of sampler | |
Laboratory sample identification | D78932 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Hat Creek Construction and Materials - Shaw Pit Facility - Lookout, CA | Transportation Laboratory (TL) Number | 854925 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | Unknown |
Sublot number | Unknown | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2021-08-30-37
DIME Test ID: 2021-08-30-37-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-09-13
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Karen Dorado
Date of test: 08/31/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.29 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 6.1 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/13/2021 ✔