Summary for Test 2021-08-30-25-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215393 DEA: 021J5104 EFIS: 0220000086 |
---|---|
DIST-CO-RTE-PM | 02-LAS,MOD-139-57.0/66.635,0.0/0.1 |
Award Date | 02/10/2021 |
Closeout Date | 11/24/2021 |
Work Description | PERFORM COLD IN-PLACE RECYCLING AND PLACE HOT MIX ASPHALT (TYPE A). |
Location Description | LASSEN AND MODOC COUNTIES NEAR ADIN FROM 4.5 MILES SOUTH OF COUNTY ROAD A2 TO 0.1 MILE SOUTH OF ROUTE 299 |
QA Service Level | 1 (Verified on 01/07/2021) |
Sample Information
Sample Taken Date | 08/30/2021 | Sample Unique Key | 25 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/03/2021 |
Sample type | Acceptance | A brief description of the sample | BINDER |
The quantity of what the sample constitutes | 1 OF 2 CANS, #1 TEST | From where was the sample collected | Source |
First name of sampler or witnessed by | E | Last name of sampler or witnessed by | CHAVEZ |
Title of sampler | MATLS | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | KLAMATH FALLS, OR | Transportation Laboratory (TL) Number | C848953 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | CONTRACTOR HAT CREEK | |
Certified Asphalt Supplier | Albina Asphalt - Klamath Falls Plant - Klamath Falls OR | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-08-30-25
DIME Test ID: 2021-08-30-25-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-09-15
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 09/09/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 176.372 grams
Mass of empty container #2: 179.453 grams
Mass of container #1 before test (m1i): 212.032 grams
Mass of container #2 before test (m2i): 214.851 grams
Mass of container #1 after test (m1f): 211.873 grams
Mass of container #2 after test (m2f): 214.685 grams
Average mass change: -0.457 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs
Test was verified on 9/15/2021 ✔