Summary for Test 2021-09-03-4-1

Test performed: CONCLP 4-16

Project Information

Project IdentifiersProject ID: 215589
DEA: 112N0084
EFIS: 1117000153
DIST-CO-RTE-PM11-IMP-7,8,78,86,98,111-Var
Award Date06/25/2021
Closeout Date09/14/2023
Work DescriptionMETHACRYLATE BRIDGE DECKS, REPAIR SPALLS AND REPLACE JOINT SEALS.
Location DescriptionIMPERIAL COUNTY AT VARIOUS LOCATIONS.
QA Service Level1 (Verified on 07/06/2021)

Sample Information

Sample Taken Date09/03/2021 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/03/2021
Sample typeAuthorization A brief description of the sampleHMWM
The quantity of what the sample constitutes1 Quart Can From where was the sample collectedManufacturer
First name of sampler or witnessed byRob Last name of sampler or witnessed byJohnson
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTranspo Industries Inc Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeMethacrylate Mfg. Lot Number(s)B0621217010
Batch numberB0621217010 Mix number3541

Test Details

DIME Sample ID: 2021-09-03-4
DIME Test ID: 2021-09-03-4-1
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CONCLP 4-16: HMWM
Test Release Date: 2021-09-03

Test Results


Input Type: Calculated
Tester's full name: Spencer Adams
Date of test: 09/03/2021
Viscosity (ASTM D 2196) Brookfield RVT with UL adapter, 50 RPM @ 77 deg F, 25 max cps @ 77 deg F: 27
Specific gravity (ASTM D 1475) 0.90 min @ 77 deg F: 1.04
Volatile content (ASTM D 2369) 30% max: 23.40
Flash point (ASTM D 3828) more than 180 deg F: 180
PCC - SSD bond strength (CA Test 551) 500 psi minimum @ 24 hours: no data
Tack free time, 400 minutes max: 499
General comments (publicly viewable) (Max 1000 characters): Bond Strength was not performed due to material failing other tests. Tack Free time went past maximum time of 400 minutes and test was ended at 400 minutes.

Test was verified on 9/3/2021