Summary for Test 2021-08-06-2-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670 |
---|---|
DIST-CO-RTE-PM | 12-ORA-405,73,405,605-9.3/24.3 |
Award Date | 11/07/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP. |
Location Description | Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2 |
QA Service Level | 1 (Verified on 09/10/2015) |
Sample Information
Sample Taken Date | 08/06/2021 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/17/2021 |
Sample type | Quality Assurance | A brief description of the sample | ASTM A706 GR 60 Hoop |
The quantity of what the sample constitutes | 880 ea. | From where was the sample collected | Source |
First name of sampler or witnessed by | Matthew | Last name of sampler or witnessed by | Temple |
Title of sampler | QA Inspector | Telephone number of sampler | 9162439722 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMC Etiwanda | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L157-019-21 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Rebar Heat Number(s) | 4109965 |
Hoop Manufacturer Lot Number(s) | 7,8,9,10,11,12 | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Size | #8 |
Diameter of Hoop | 5'-4.5" | Epoxy Coated | No |
Epoxy Coating Color | NA | Rebar Manufacturer | CMC Etiwanda |
Welding Company | CMC Etiwanda | Coating Standards | Uncoated |
Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2021-08-06-2
DIME Test ID: 2021-08-06-2-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2021-08-19
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 08/18/2021
UTM: 400kip
Temperature: 72 f
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 3 | 7 & 12 | 8/25mm | 0.79 | 76903.50 | 97346 | ok necking | spaine |
General comments (publicly viewable) (Max 1000 characters): ok necking
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 8/19/2021 ✔