Summary for Test 2021-07-22-31-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215579 DEA: 061A9504 EFIS: 0620000144 |
---|---|
DIST-CO-RTE-PM | 06-KER-46;65,65-51.2/57.8;0.8/6.9 |
Award Date | 04/27/2021 |
Closeout Date | 03/02/2022 |
Work Description | COLD PLANE PAVEMENT AND PLACE RHMA (GAP GRADED). |
Location Description | KERN COUNTY ON ROUTE 46 FROM NORTH JUNCTION ROUTE 43 TO ROUTE 46/99 SEPARATION AND ON ROUTE 65 FROM 0.1 MILE NORTH OF 7TH STANDARD ROAD TO 0.1 MILE NORTH OF MERCED AVENUE. |
QA Service Level | 1 (Verified on 03/22/2021) |
Sample Information
Sample Taken Date | 07/22/2021 | Sample Unique Key | 31 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/30/2021 |
Sample type | Department Acceptance | A brief description of the sample | PG 64-16 |
The quantity of what the sample constitutes | 1 can | From where was the sample collected | Source |
First name of sampler or witnessed by | granite | Last name of sampler or witnessed by | granite |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | San Joaquin Refinery | Transportation Laboratory (TL) Number | c772205 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | Granite | |
Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-07-22-31
DIME Test ID: 2021-07-22-31-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-08-10
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 08/02/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 173.719 grams
Mass of empty container #2: 179.437 grams
Mass of container #1 before test (m1i): 208.737 grams
Mass of container #2 before test (m2i): 214.467 grams
Mass of container #1 after test (m1f): 208.735 grams
Mass of container #2 after test (m2f): 214.458 grams
Average mass change: -0.016 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 8/10/2021 ✔