Summary for Test 2021-06-13-3-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 215237 DEA: 101H4204 EFIS: 1018000166 |
|---|---|
| DIST-CO-RTE-PM | 10-MER-5-17.0/22.6 |
| Award Date | 12/09/2020 |
| Closeout Date | 03/02/2022 |
| Work Description | RESURFACE WITH RUBBERIZED HOT MIXED ASPHALT. |
| Location Description | MERCED COUNTY AT AND NEAR SANTA NELLA FROM 0.5 MILE SOUTH OF ROUTE 5/152 SEPARATION TO MCCABE ROAD OVERCROSSING |
| QA Service Level | 1 (Verified on 10/23/2020) |
Sample Information
| Sample Taken Date | 06/13/2021 | Sample Unique Key | 3 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/21/2021 | Sample type | Department Acceptance |
| A brief description of the sample | ASPHALT BINDER | The quantity of what the sample constitutes | 1 OF 2 CANS |
| From where was the sample collected | Source | First name of sampler or witnessed by | J |
| Last name of sampler or witnessed by | DEHOFF | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | MARATHON ELK GROVE | |
| Transportation Laboratory (TL) Number | 760557 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 70-10 |
|---|---|---|---|
| Modified | No | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | TEICHERT VERNALIS | |
| Certified Asphalt Supplier | Marathon Petroleum Co. LP - Elk Grove CA | Multigrade | No |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2021-06-13-3
DIME Test ID: 2021-06-13-3-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-07-07
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 06/25/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.494 grams
Mass of empty container #2: 179.922 grams
Mass of container #1 before test (m1i): 202.586 grams
Mass of container #2 before test (m2i): 215.024 grams
Mass of container #1 after test (m1f): 202.501 grams
Mass of container #2 after test (m2f): 214.931 grams
Average mass change: -0.254 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 Standard Specifications
Test was verified on 7/7/2021 ✔