Summary for Test 2021-06-17-17-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215092 DEA: 101C0404 EFIS: 1017000034 |
---|---|
DIST-CO-RTE-PM | 10-MPA-49-0.3/18.5 |
Award Date | 10/01/2020 |
Closeout Date | 06/27/2022 |
Work Description | COLD PLANE, PLACE HMA AND REPLACE RAILING AND OVERSIDE DRAINS. |
Location Description | MARIPOSA COUNTY IN AND NEAR MARIPOSA FROM MADERA COUNTY LINE TO SOUTH JUNCTION ROUTE 140 |
QA Service Level | 1 (Verified on 08/20/2020) |
Sample Information
Sample Taken Date | 06/17/2021 | Sample Unique Key | 17 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/21/2021 |
Sample type | Department Acceptance | A brief description of the sample | ASPHALT BINDER |
The quantity of what the sample constitutes | 1 of 1 can | From where was the sample collected | Source |
First name of sampler or witnessed by | M | Last name of sampler or witnessed by | COZAD |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | MARATHON ELK GROVE | Transportation Laboratory (TL) Number | 034162 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | Teichert - Santa Fe Winton | |
Certified Asphalt Supplier | Marathon Petroleum Co. LP - Elk Grove CA | Multigrade | No |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-06-17-17
DIME Test ID: 2021-06-17-17-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-06-24
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 06/23/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 160.000 grams
Mass of empty container #2: 177.190 grams
Mass of container #1 before test (m1i): 209.640 grams
Mass of container #2 before test (m2i): 227.260 grams
Mass of container #1 after test (m1f): 209.500 grams
Mass of container #2 after test (m2f): 227.120 grams
Average mass change: -0.281 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 standard specifications
Test was verified on 6/24/2021 ✔