Summary for Test 2021-05-24-38-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215253 DEA: 021J4804 EFIS: 0220000083 |
---|---|
DIST-CO-RTE-PM | 02-SHA,TRI-36-8.0/11.912,27.1/R41.139 |
Award Date | 02/05/2021 |
Closeout Date | 09/30/2021 |
Work Description | ASPHALT RUBBER CHIP SEAL AND TRAFFIC STRIPE. |
Location Description | SHASTA AND TRINITY COUNTIES AT AND NEAR PLATINA FROM 0.4 MILE EAST OF MIDDLE FORK COTTONWOOD CREEK BRIDGE TO BEEGUM CREEK BRIDGE AND FROM 1.3 MILES EAST OF BRAMLET ROAD TO SHASTA COUNTY LINE |
QA Service Level | 1 (Verified on 10/30/2020) |
Sample Information
Sample Taken Date | 05/24/2021 | Sample Unique Key | 38 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/17/2021 |
Sample type | Acceptance | A brief description of the sample | ASPHALT BINDER |
The quantity of what the sample constitutes | 1 OF 2 CANS | From where was the sample collected | Source |
First name of sampler or witnessed by | D. | Last name of sampler or witnessed by | OWENS |
Title of sampler | PEI | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Valero-Benicia Asphalt Plant | Transportation Laboratory (TL) Number | 779360 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-22 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-05-24-38
DIME Test ID: 2021-05-24-38-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-06-23
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 06/21/2021
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 156.612 grams
Mass of empty container #2: 167.153 grams
Mass of container #1 before test (m1i): 191.756 grams
Mass of container #2 before test (m2i): 202.103 grams
Mass of container #1 after test (m1f): 191.554 grams
Mass of container #2 after test (m2f): 201.870 grams
Average mass change: -0.621 percent
General comments (publicly viewable) (Max 1000 characters): Per 2018 standard specifications
Test was verified on 6/23/2021 ✔