Summary for Test 2021-06-02-20-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 215127
DEA: 024G5304
EFIS: 0214000023
DIST-CO-RTE-PM02-LAS,SHA,TEH-5,32,36,44,299-VAR
Award DateNot set
Closeout DateNot set
Work DescriptionDITCH EXCAVATION, DEVELOP TEMP CREEK DIVERSION SYSTEM, AND PLACE RSP. DISTRICT WIDE SCOUR COUNTER-MEASURES.
Location DescriptionLASSEN, SHASTA, AND TEHAMA COUNTIES AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 08/26/2020)

Sample Information

Sample Taken Date06/02/2021 Sample Unique Key20
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/03/2021
Sample typeAcceptance A brief description of the sampleClean Sand and Gravel
The quantity of what the sample constitutesUndeclared From where was the sample collectedManufacturer
First name of sampler or witnessed byCindy Last name of sampler or witnessed byBryant
Title of samplerTET Telephone number of sampler
Laboratory sample identificationD78824 Linked DIME Sample ID
The fabricator/manufacturer/facility nameJF Shea Construction, Aggregate Products, Redding Transportation Laboratory (TL) Number853343
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA or name of Pit)91-45-0019
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedStockpile at Aggregate Products
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-06-02-20
DIME Test ID: 2021-06-02-20-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-06-25

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Individual Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Measured
Tester's full name: Karen Dorado
Date of test: 06/04/2021
Total mass of sample prior to washing: no data
Individual mass retained on the 3 in. sieve: 0 grams
Individual mass retained on the 2 1/2 in. sieve: 0 grams
Individual mass retained on the 2 in. sieve: 0 grams
Individual mass retained on the 1 1/2 in. sieve: 0 grams
Individual mass retained on the 1 in. sieve: 0 grams
Individual mass retained on the 3/4 in. sieve: 1757 grams
Individual mass retained on the 1/2 in. sieve: 6918 grams
Individual mass retained on the 3/8 in. sieve: 3518 grams
Individual mass retained on the #4 sieve: 560 grams
Individual mass retained on the #8 sieve: 200 grams
Individual mass retained on the #16 sieve: 106.4 grams
Individual mass retained on the #30 sieve: 63.4 grams
Individual mass retained on the #50 sieve: 42.2 grams
Individual mass retained on the #100 sieve: 29 grams
Individual mass retained on the #200 sieve: 18.1 grams
Individual mass retained on the pan: 57.1 grams
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 89 %
Cumulative percent passing the 1/2 in. sieve: 43.8 %
Cumulative percent passing the 3/8 in. sieve: 21 %
Cumulative percent passing the #4 sieve: 17 %
Cumulative percent passing the #8 sieve: 10 %
Cumulative percent passing the #16 sieve: 7 %
Cumulative percent passing the #30 sieve: 5 %
Cumulative percent passing the #50 sieve: 3 %
Cumulative percent passing the #100 sieve: 2 %
Cumulative percent passing the #200 sieve: 1.9 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/25/2021