Summary for Test 2021-04-01-40-3

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 214426
DEA: 030A5704
EFIS: 0300020593
DIST-CO-RTE-PM03-YUB-20-13.3/R18.2
Award Date01/02/2020
Closeout DateNot set
Work DescriptionBrowns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK.
Location DescriptionYUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE
QA Service Level1 (Verified on 10/23/2019)

Sample Information

Sample Taken Date04/01/2021 Sample Unique Key40
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/01/2021
Sample typeVerification A brief description of the sampleRAP minus 1/2"
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byTeichert Personnel (SAMPLER) Last name of sampler or witnessed by Brad McKeehan (WITNESS)
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationJMF21-020C Linked DIME Sample ID
The fabricator/manufacturer/facility nameTeichert - Hallwood Plant Transportation Laboratory (TL) NumberC706329
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceTeichert Hallwood RAP Bin 1
Aggregate Size Aggregate Source
RAP StockpileStatic Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-04-01-40
DIME Test ID: 2021-04-01-40-3
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-06-10

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Mario Munoz
Date of test: 04/07/2021
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 96 %
Cumulative percent passing the 3/8 in. sieve: 85 %
Cumulative percent passing the #4 sieve: 58 %
Cumulative percent passing the #8 sieve: 40 %
Cumulative percent passing the #16 sieve: 30 %
Cumulative percent passing the #30 sieve: 23 %
Cumulative percent passing the #50 sieve: 16 %
Cumulative percent passing the #100 sieve: 12 %
Cumulative percent passing the #200 sieve: 9.0 %
General comments (publicly viewable) (Max 1000 characters): JMF21-020C.

Test was verified on 6/10/2021