Summary for Test 2021-04-01-34-3

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 215062
DEA: 030F2904
EFIS: 0314000101
DIST-CO-RTE-PM03-BUT-99-14.9/15.7
Award Date09/24/2020
Closeout Date03/02/2022
Work DescriptionCONSTRUCT BRIDGE AND ROADWAY; & REMOVE BRIDGE.
Location DescriptionBUTTE COUNTY ABOUT 10 MILES NORTH OF GRIDLEY FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF NELSON AVENUE
QA Service Level1 (Verified on 07/20/2020)

Sample Information

Sample Taken Date04/01/2021 Sample Unique Key34
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/01/2021
Sample typeVerification A brief description of the sampleRAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byTeichert Personnel (SAMPLER) Last name of sampler or witnessed by Brad McKeehan (WITNESS)
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample IDJMF21-020B
The fabricator/manufacturer/facility nameTeichert - Hallwood Plant Transportation Laboratory (TL) NumberC706327
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceTeichert Hallwood RAP Bin 1
Aggregate Size Aggregate Source
RAP StockpileStatic Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-04-01-34
DIME Test ID: 2021-04-01-34-3
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-06-03

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Mario Munoz
Date of test: 04/28/2021
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 96 %
Cumulative percent passing the 3/8 in. sieve: 85 %
Cumulative percent passing the #4 sieve: 58 %
Cumulative percent passing the #8 sieve: 40 %
Cumulative percent passing the #16 sieve: 30 %
Cumulative percent passing the #30 sieve: 23 %
Cumulative percent passing the #50 sieve: 16 %
Cumulative percent passing the #100 sieve: 12 %
Cumulative percent passing the #200 sieve: 9.0 %
General comments (publicly viewable) (Max 1000 characters): JMF21-020B.

Test was verified on 6/3/2021