Summary for Test 2021-04-01-34-3
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 215062 DEA: 030F2904 EFIS: 0314000101 |
---|---|
DIST-CO-RTE-PM | 03-BUT-99-14.9/15.7 |
Award Date | 09/24/2020 |
Closeout Date | 03/02/2022 |
Work Description | CONSTRUCT BRIDGE AND ROADWAY; & REMOVE BRIDGE. |
Location Description | BUTTE COUNTY ABOUT 10 MILES NORTH OF GRIDLEY FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF NELSON AVENUE |
QA Service Level | 1 (Verified on 07/20/2020) |
Sample Information
Sample Taken Date | 04/01/2021 | Sample Unique Key | 34 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/01/2021 |
Sample type | Verification | A brief description of the sample | RAP |
The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Teichert Personnel (SAMPLER) | Last name of sampler or witnessed by | Brad McKeehan (WITNESS) |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | JMF21-020B | |
The fabricator/manufacturer/facility name | Teichert - Hallwood Plant | Transportation Laboratory (TL) Number | C706327 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Teichert Hallwood RAP Bin 1 |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Static | Stockpile Size (tons) | Unknown |
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2021-04-01-34
DIME Test ID: 2021-04-01-34-3
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-06-03
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Mario Munoz
Date of test: 04/28/2021
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 96 %
Cumulative percent passing the 3/8 in. sieve: 85 %
Cumulative percent passing the #4 sieve: 58 %
Cumulative percent passing the #8 sieve: 40 %
Cumulative percent passing the #16 sieve: 30 %
Cumulative percent passing the #30 sieve: 23 %
Cumulative percent passing the #50 sieve: 16 %
Cumulative percent passing the #100 sieve: 12 %
Cumulative percent passing the #200 sieve: 9.0 %
General comments (publicly viewable) (Max 1000 characters): JMF21-020B.
Test was verified on 6/3/2021 ✔