Summary for Test 2021-05-10-27-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215092 DEA: 101C0404 EFIS: 1017000034 |
---|---|
DIST-CO-RTE-PM | 10-MPA-49-0.3/18.5 |
Award Date | 10/01/2020 |
Closeout Date | 06/27/2022 |
Work Description | COLD PLANE, PLACE HMA AND REPLACE RAILING AND OVERSIDE DRAINS. |
Location Description | MARIPOSA COUNTY IN AND NEAR MARIPOSA FROM MADERA COUNTY LINE TO SOUTH JUNCTION ROUTE 140 |
QA Service Level | 1 (Verified on 08/20/2020) |
Sample Information
Sample Taken Date | 05/10/2021 | Sample Unique Key | 27 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/21/2021 |
Sample type | Acceptance | A brief description of the sample | PG64-10 |
The quantity of what the sample constitutes | 1 of 2 cans | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Adam | Last name of sampler or witnessed by | Z |
Title of sampler | ARE | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Teichert - Santa Fe Winton | Transportation Laboratory (TL) Number | c994286 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
---|---|---|---|
Modified | No | Lot number | 1 |
Sublot number | 1 | Tank number | |
Time of sample | HMA Supplier | Teichert - Santa Fe Winton | |
Certified Asphalt Supplier | Marathon Petroleum Co. LP - Elk Grove CA | Multigrade | No |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-05-10-27
DIME Test ID: 2021-05-10-27-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-06-01
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 05/10/2021
Any material loss from containers during heating process/testing?: Yes
Mass of empty container #1: 166.533 grams
Mass of empty container #2: 166.191 grams
Mass of container #1 before test (m1i): 201.538 grams
Mass of container #2 before test (m2i): 201.912 grams
Mass of container #1 after test (m1f): 201.430 grams
Mass of container #2 after test (m2f): 201.803 grams
Average mass change: -0.307 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/1/2021 ✔