Summary for Test 2021-03-17-11-5

Test performed: ASTM C231-17a

Project Information

Project IdentifiersProject ID: 214422
DEA: 040J6424
EFIS: 0414000476
DIST-CO-RTE-PM04-SON-101-32.8/R54.2
Award Date12/24/2019
Closeout DateNot set
Work DescriptionCRACK, SEAT AND OVERLAY WITH RHMA AND HMA, AND REPLACE CULVERTS.
Location DescriptionSONOMA COUNTY AT VARIOUS LOCATIONS FROM LIMERICK LANE OVERCROSSING TO ROUTE 101/128 SEPARATION
QA Service Level1 (Verified on 09/23/2019)

Sample Information

Sample Taken Date03/17/2021 Sample Unique Key11
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/17/2021
Sample typeQuality Control A brief description of the sampleSCC concrete
The quantity of what the sample constitutes2.8 CY From where was the sample collectedManufacturer
First name of sampler or witnessed byAvery Last name of sampler or witnessed byFlores
Title of samplerQuality Control Manager Telephone number of sampler9255258562
Laboratory sample identification21052 Linked DIME Sample ID
The fabricator/manufacturer/facility nameOldcastle Infrastructure Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier04-son-101-32.8/R54.2
Structure nameWaqas Ather

Material Information

Material TypeConcrete The concrete mix design number54
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected90253
Concrete batch plantOldcastle Infrastructure The fabricator/manufacturer designation for the sampleBatch
A detailed description of where the material sample was collectedTravelling Bucket Where the material sample would have been placed if not sampledReinforced Box Culvert
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2021-03-17-11
DIME Test ID: 2021-03-17-11-5
Testing Lab: Oldcastle Precast, Incorporated - Pleasanton
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2021-04-22

Test Results


Is wet sieving required?: No
Input Type: Calculated
Tester's full name: Avery Flores
Date of test: 03/17/2021
Air content: 2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/22/2021