Summary for Test 2021-04-16-2-2
Test performed: ASTM A970-15e1Project Information
Project Identifiers | Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670 |
---|---|
DIST-CO-RTE-PM | 12-ORA-405,73,405,605-9.3/24.3 |
Award Date | 11/07/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP. |
Location Description | Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2 |
QA Service Level | 1 (Verified on 09/10/2015) |
Sample Information
Sample Taken Date | 04/16/2021 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/20/2021 |
Sample type | Quality Assurance | A brief description of the sample | HRC 120 T-Heads |
The quantity of what the sample constitutes | 40 | From where was the sample collected | Source |
First name of sampler or witnessed by | Leslie | Last name of sampler or witnessed by | Guerrero |
Title of sampler | Quality Assurance Inspector | Telephone number of sampler | 4242338040 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Headed Reinforcement Corp, Fountain Valley, CA | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L153-019-21 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Headed Bars | Production or Authorization Testing | Production Testing |
---|---|---|---|
Rebar Heat Number(s) | 4097550 | Head Manufacturer Lot Number(s) | Lot 1 |
Rebar Size | #11 | Headed Bar Model Name | HRC 120 |
Size of Head | Full Size - 9x | Head Connection Type | |
Head Shape | Square | Rebar Manufacturer | CMC Steel Arizona |
Head Manufacturer | Nucor | Head Fabricator | Headed Reinforcement Corp |
Material Standard Code | ASTM A706 | Headed Bar Unique ID | Not set |
Test Details
DIME Sample ID: 2021-04-16-2
DIME Test ID: 2021-04-16-2-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: ASTM A970-15e1: Standard Specification for Headed Steel Bars for Concrete Reinforcement (Tensile)
Test Release Date: 2021-04-21
Test Results
Number of Headed Bar Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 04/21/2021
UTM: 400kip
Temperature: 72 f
Num | Lot # | Area (sqin) | Peak Load (lbf) | Tensile Strength (psi) | Comments | Tested By |
---|---|---|---|---|---|---|
1 | 1 | 1.56 | 149060 | 95551 | Ok Necking | bewing |
General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 4/21/2021 ✔