Summary for Test 2021-03-12-19-3

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 215307
DEA: 033F5004
EFIS: 0313000019
DIST-CO-RTE-PM03-GLE-5-R7.4/R17.0
Award Date01/04/2021
Closeout Date11/30/2021
Work DescriptionPLACE HMA (TYPE A) AND MODIFY INTERCONNECTION CONDUIT AND CABLE.
Location DescriptionGLENN COUNTY IN AND NEAR WILLOWS AT VARIOUS LOCATIONS FROM COUNTY ROAD 57 OVERCROSSING TO COUNTY ROAD 33 OVERCROSSING
QA Service Level1 (Verified on 12/02/2020)

Sample Information

Sample Taken Date03/12/2021 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/12/2021
Sample typeVerification A brief description of the sampleRAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byBrad McKeehan (WITNESS) Last name of sampler or witnessed byKRC Personnel (SAMPLER)
Title of sampler Telephone number of sampler
Laboratory sample identificationJMF21-003 Linked DIME Sample ID
The fabricator/manufacturer/facility nameKnife River Construction - Orland Drum Plant Transportation Laboratory (TL) NumberC778174
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceKRC Orland
Aggregate Size Aggregate Source
RAP StockpileContinuous Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2021-03-12-19
DIME Test ID: 2021-03-12-19-3
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-04-05

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Ben Dreher
Date of test: 03/08/2021
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 92 %
Cumulative percent passing the #4 sieve: 63 %
Cumulative percent passing the #8 sieve: 43 %
Cumulative percent passing the #16 sieve: 32 %
Cumulative percent passing the #30 sieve: 23 %
Cumulative percent passing the #50 sieve: 16 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 8.2 %
General comments (publicly viewable) (Max 1000 characters): JMF21-003.

Test was verified on 4/5/2021