Summary for Test 2015-05-28-1-4
Test performed: CTM 533-June 2010Project Information
Project Identifiers | Project ID: 209788 DEA: 034F0704 EFIS: 0314000020 |
---|---|
DIST-CO-RTE-PM | 03-SAC-50-17.1 |
Award Date | 10/31/2014 |
Closeout Date | 11/30/2017 |
Work Description | WIDEN STRUCTURE, EXTEND WEAVE LANE, AND ADD RAMP METERING. |
Location Description | SACRAMENTO COUNTY AT NATOMA OVERHEAD |
QA Service Level | 1 (Verified on 12/26/2014) |
Sample Information
Sample Taken Date | 05/28/2015 | Sample Unique Key | 1 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/29/2015 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinder |
The quantity of what the sample constitutes | 4 6x12 concrete cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Oleg | Last name of sampler or witnessed by | Kreydich |
Title of sampler | SR | Telephone number of sampler | (530) 204-7059 |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Jobsite | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Unknown |
Structure name | Natoma OH |
Material Information
Material Type | Concrete | The concrete mix design number | F628AFST0 |
---|---|---|---|
The truck number from where the sample was collected | 40 | The batch plant ticket number from where the sample was collected | 1062346 |
Concrete batch plant | 1B | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow | Where the material sample would have been placed if not sampled | Footing |
From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2015-05-28-1
DIME Test ID: 2015-05-28-1-4
Testing Lab: CT SC - 3665 - Shingle Springs
Test Method: CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement Concrete
Test Release Date: 2015-05-29
Test Results
Input Type: Measured
Tester's full name: OLEG KREYDICH
Date of test: 05/28/2015
Ball penetration in freshly mixed concrete, measure 1: 2.25 inch
Ball penetration in freshly mixed concrete, measure 2: 2.5 inch
Ball penetration in freshly mixed concrete, measure 3: 2.5 inch
Ball penetration in freshly mixed concrete (average): 2.5 inch
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/29/2015 ✔