Summary for Test 2021-01-04-13-1
Test performed: CTM 523-July 2012Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Sample Information
Sample Taken Date | 01/04/2021 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/05/2021 |
Sample type | Quality Assurance | A brief description of the sample | JPCP beams |
The quantity of what the sample constitutes | 4 Beams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | QC | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 11JJA1, 11JJA2, 11JJB1, 11JJB2 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Coffman Specialties, Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1906-11 |
---|---|---|---|
The truck number from where the sample was collected | Unknown | The batch plant ticket number from where the sample was collected | tt |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2021-01-04-13
DIME Test ID: 2021-01-04-13-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 523-July 2012: Method of Test for Flexural Strength of Concrete
Test Release Date: 2021-01-27
Test Results
What test method is being used?: Third-Point Loading
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Lab procedure used: Method B
Input Type: Calculated
Tester's full name: k. Talati
Date of test: 01/14/2021
Identification number: 11JJA1
Width of specimen: 5.9375 inch
Depth of specimen: 6.0625 inch
Span length of specimen: 18 inch
Maximum load applied: 6335 lb
Curing history and apparent moisture condition of the specimen: Sand pit
If specimen was capped, ground or if leather shims were used: No
Defects in specimen: None
Age of specimen: 10 days
Modulus of rupture: 550 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/27/2021 ✔