Summary for Test 2020-11-25-9-1
Test performed: AASHTO T240-17
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Project Information
Project Identifiers | Project ID: 55555 DEA: AMRL EFIS: AMRL |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for AASHTO Materials Reference Laboratory (AMRL). |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 11/25/2020 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/05/2021 |
Sample type | Proficiency | A brief description of the sample | Asphalt Binder OREGON COOP |
The quantity of what the sample constitutes | 1 can, Due JAN 25 | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | B | Last name of sampler or witnessed by | S |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 309 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | McCall Oli and Chemical Corp | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-28 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | PG 64-22 | |
Time of sample | HMA Supplier | Not set | |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-11-25-9
DIME Test ID: 2020-11-25-9-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-01-13
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 01/11/2021
Any material loss from containers during heating process/testing?: no data
Mass of empty container #1: 171.658 grams
Mass of empty container #2: 172.889 grams
Mass of container #1 before test (m1i): 202.039 grams
Mass of container #2 before test (m2i): 203.266 grams
Mass of container #1 after test (m1f): 201.952 grams
Mass of container #2 after test (m2f): 203.170 grams
Average mass change: -0.301 percent
General comments (publicly viewable) (Max 1000 characters): per 2018 standard specification
Test was verified on 1/13/2021 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.