Summary for Test 2021-01-05-2-2
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 213750 DEA: 120K0224 EFIS: 1214000097 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-14.5/17.1 |
Award Date | 03/05/2019 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 2 - Oso/Alicia) CONST BRIDGES, RW, SW, HMA PVMT, JPCP, DRAINAGE, AND ELECT SYSTEMS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO AND LAGUNA HILLS FROM 0.7 MILE SOUTH OF OSO PARKWAY OVERCROSSING TO 0.3 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING |
QA Service Level | 1 (Verified on 04/15/2019) |
Sample Information
Sample Taken Date | 01/05/2021 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/07/2021 |
Sample type | Quality Assurance | A brief description of the sample | #10 GripTwist Couplers |
The quantity of what the sample constitutes | 150 Couplers | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Ravi | Last name of sampler or witnessed by | Lad |
Title of sampler | Telephone number of sampler | 213-280-7857 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Integrity Rebar | Transportation Laboratory (TL) Number | C809402 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Gerdau |
Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
Rebar Size | #10 | Coupler Model | Griptwist |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | A201362 | Rebar Heat Number(s) | 65029807 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-01-05-2
DIME Test ID: 2021-01-05-2-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-01-07
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 01/07/2021
UTM: 2000kip
Temperature: 72.00 f
Halo ID:
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 2 | No. 10/32mm | 1 | 0 | 1.27 | 124902 | 98348 | OK Necking | fsaylor |
General comments (publicly viewable) (Max 1000 characters): OK Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 1/7/2021 ✔