Summary for Test 2020-12-15-16-1

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 212914
DEA: 031E0604
EFIS: 0312000068
DIST-CO-RTE-PM03-YUB-70-15.5/16.5
Award Date07/31/2019
Closeout Date08/30/2023
Work DescriptionSIMMERLY SLOUGH BRIDGE REPLACEMENT BR 16-0019 WITH BR 16-0055.
Location DescriptionNEAR MARYSVILLE, FROM 0.1 MILE NORTH OF BINNEY JUNCTION UNDERPASS TO 0.3 MILE NORTH OF LAURELLEN ROAD, AT SIMMERLY SLOUGH BRIDGE BR 16-0019.
QA Service Level1 (Verified on 08/22/2019)

Sample Information

Sample Taken Date12/15/2020 Sample Unique Key16
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/18/2020
Sample typeDepartment Acceptance A brief description of the samplePG Binder
The quantity of what the sample constitutes1 of 2 From where was the sample collectedOther
First name of sampler or witnessed byM. Last name of sampler or witnessed byChitterden
Title of samplerTET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTeichert Hallwood Transportation Laboratory (TL) NumberC724304
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA SupplierNot set
Certified Asphalt SupplierNot set MultigradeNot set
Multigrade TypeNot set Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2020-12-15-16
DIME Test ID: 2020-12-15-16-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-12-30

Test Results


Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 12/23/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 173.715 grams
Mass of container #1 before test (m1i): 210.254 grams
Mass of container #1 after test (m1f): 210.22 grams
Average mass change: -0.093 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 standard specs

Test was verified on 12/30/2020