Summary for Test 2020-12-07-10-1

Test performed: AASHTO T240-17

Project Information

Project IdentifiersProject ID: 215023
DEA: 060U4704
EFIS: 0615000301
DIST-CO-RTE-PM06-KER,KIN-5-81.7/87.0,0.0/0.3
Award Date08/12/2020
Closeout Date06/27/2023
Work DescriptionCONSTRUCT CRCP, JPCP AND INSTALL TRAFFIC MONITORING STATIONS.
Location DescriptionKERN AND KINGS COUNTIES NEAR KETTELMAN CITY FROM 0.6 MILE SOUTH OF TWISSELMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE
QA Service Level1 (Verified on 06/17/2020)

Sample Information

Sample Taken Date12/07/2020 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing12/09/2020
Sample typeQuality Assurance A brief description of the sampleAsphalt Binder
The quantity of what the sample constitutes1 From where was the sample collectedOther
First name of sampler or witnessed byG. Last name of sampler or witnessed byLitt
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSan Joaquin Refinery, Bakersfield, CA Transportation Laboratory (TL) NumberC040255
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 70-10
ModifiedNo Lot number
Sublot number Tank numberNot set
Time of sampleNot set HMA SupplierNot set
Certified Asphalt SupplierNot set MultigradeNot set
Multigrade TypeNot set Asphalt Binder Mix NumberNot set

Test Details

DIME Sample ID: 2020-12-07-10
DIME Test ID: 2020-12-07-10-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-12-17

Test Results


Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 12/16/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 174.558 grams
Mass of container #1 before test (m1i): 211.482 grams
Mass of container #1 after test (m1f): 211.480 grams
Average mass change: -0.005 percent
General comments (publicly viewable) (Max 1000 characters): as per 2018 Standard specs

Test was verified on 12/17/2020