Test 2020-04-14-50-1 (AASHTO T308-10) Summary

Project Information
Project IdentifiersProject ID: 214492
DEA: 033F5404
EFIS: 0313000136
DIST-CO-RTE-PM03-SAC-99,160-4.5/5.7,R44.5
Work DescriptionFURNISH PRECAST PRESTRESSED CONCRETE SLAB & PLACE STRUCTURAL CONCRETE.
Location DescriptionSACRAMENTO COUNTY NEAR GALT ON ROUTE 99 FROM NORTH OF MINGO ROAD TO SOUTH OF ARNO ROAD OVERCROSSING AND IN SACRAMENTO ON ROUTE 160 AT AMERICAN RIVER BRIDGE
Sample Information
Sample Taken Date4/14/2020 Sample Unique Key50
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing4/15/2020
Sample typeVerification A brief description of the sample1/2 inch HMA - A (SP)
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byWalt Last name of sampler or witnessed byWylie (Witness)
Title of samplerTeichert Personnel Laboratory sample identificationJMF20-014
The fabricator/manufacturer/facility nameTeichert Perkins Batch Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot number
Sublot number JMF Verification ID JMF3513-2020-222
Test Details
DIME Sample ID: 2020-04-14-50
DIME Test ID: 2020-04-14-50-1
Testing Lab: CT D03 - North Region Materials Lab
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Test Release Date: 2020-11-25
Test Results

Input Type: Calculated
Tester's full name: Terrance White
Date of test: 05/15/2020
Correction Factor (Percent by mass of HMA Specimen): no data
Asphalt Binder Content:5.20 %
General comments (publicly viewable) (Max 1000 characters): JMF20-014

Test was verified on 11/25/2020