Test 2020-10-12-42-4 (ASTM D217-16) Summary

Project Information
Project IdentifiersProject ID: 214731
DEA: 051M0004
EFIS: 0519000047
DIST-CO-RTE-PM05-SLO-101-16.5/R21.5
Work DescriptionCOLD PLANE AND RHMA-GAP GRADED OVERLAY ON EXISTING ROADWAY.
Location DescriptionSAN LUIS OBISPO COUNTY IN AND NEAR PISMO BEACH FROM 0.1 MILE SOUTH OF PRICE CANYON ROAD TO SAN LUIS CREEK BRIDGE
Sample Information
Sample Taken Date10/12/2020 Sample Unique Key42
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/19/2020
Sample typeAcceptance A brief description of the sample#19 Test since #15 fails
The quantity of what the sample constitutes1 Can From where was the sample collectedSource
First name of sampler or witnessed byJavier Last name of sampler or witnessed byRios
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameSPM Templeton Transportation Laboratory (TL) Number2010113E
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAsphalt Rubber Binder Asphalt modifier supplier
Performance GradePG 64-16 Lot number
Sublot number HMA Design ID JMF3513-2020-171
Test Details
DIME Sample ID: 2020-10-12-42
DIME Test ID: 2020-10-12-42-4
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Test Release Date: 2020-11-02
Test Results

Determination: Unworked Penetration
Input Type: Measured
Tester's full name: Minoo Ahmadi
Date of test: 10/27/2020
Unworked Penetration, Test 1: 30 0.1 mm
Unworked Penetration, Test 2: 27 0.1 mm
Unworked Penetration, Test 3: 27 0.1 mm
Unworked Penetration:28 0.1 mm
General comments (publicly viewable) (Max 1000 characters): Per 2018 standard specifications

Test was verified on 11/02/2020