Summary for Test 2020-07-17-24-5

Test performed: CTM 551-August 2012

Project Information

Project IdentifiersProject ID: 213569
DEA: 024F2104
EFIS: 0212000072
DIST-CO-RTE-PM02-MOD-299-0.5/1.0
Award Date12/20/2018
Closeout Date11/15/2021
Work DescriptionButte and Ash Creek Bridge Replacement
Location DescriptionConstruction of Butte Creek Bridge and Ash Creek Bridge on Route 299 at Adin
QA Service Level1 (Verified on 06/26/2019)

Sample Information

Sample Taken Date07/17/2020 Sample Unique Key24
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/17/2020
Sample typeQuality Control A brief description of the sample1 gallon can
The quantity of what the sample constitutes36 Totes From where was the sample collectedSource
First name of sampler or witnessed byDaniel Last name of sampler or witnessed byTikusis
Title of samplerTechnical Director Telephone number of sampler7073309227
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameKwik Bond Polymers and Reichhold Transportation Laboratory (TL) NumberSacramento Caltrans lab
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypePolyester Mfg. Lot Number(s)1265453
Batch number1265453 Mix number1265453

Test Details

DIME Sample ID: 2020-07-17-24
DIME Test ID: 2020-07-17-24-5
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CTM 551-August 2012: Method of Test for Determining Suitability of Materials for Overlayment and Repair of Portland Cement Concrete Pavements and Structures
Test Release Date: 2020-10-19

Test Results


Input Type: Calculated
Tester's full name: Vendor Results
Date of test: 10/19/2020
Curing history for Sample 1: 24hr
Maximum applied load (P) for Sample 1: 1605 lb
Span length for Sample 1: 9 in
Break location for Sample 1: bond
Specimen defects/notes for Sample 1: no data
Surface type for Sample 1: SSD
Modulus of rupture (R) for Sample 1: 802.5 psi
Curing history for Sample 2: 24hr
Maximum applied load (P) for Sample 2: 1583.4 lb
Span length for Sample 2: 9 in
Break location for Sample 2: bond
Specimen defects/notes for Sample 2: no data
Surface type for Sample 2: SSD
Modulus of rupture (R) for Sample 2: 791.7 psi
Curing history for Sample 3: 24hr
Maximum applied load (P) for Sample 3: 1370.2 lb
Span length for Sample 3: 9 in
Break location for Sample 3: bond
Specimen defects/notes for Sample 3: no data
Surface type for Sample 3: SSD
Modulus of rupture (R) for Sample 3: 685.1 psi
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/19/2020