Test 2020-09-28-39-2 (AASHTO T301-13) Summary

Project Information
Project IdentifiersProject ID: 213826
DEA: 023H1704
EFIS: 0217000066
DIST-CO-RTE-PM02-MOD-299-Var
Work DescriptionCOLD IN-PLACE RECYCLING COVERED WITH HMA, GUARDRAIL, STRIPING.
Location DescriptionMODOC COUNTY IN AND NEAR ALTURAS AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF ROCK CREEK BRIDGE TO PATTERSON STREET
Sample Information
Sample Taken Date9/28/2020 Sample Unique Key39
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/2/2020
Sample typeAcceptance A brief description of the sampleAB #1 Test
The quantity of what the sample constitutes1 Can From where was the sample collectedSource
First name of sampler or witnessed byDorell Last name of sampler or witnessed byHarper
Title of samplerpse Laboratory sample identification
The fabricator/manufacturer/facility nameAlbina Transportation Laboratory (TL) Number002581
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAsphalt Binder Performance GradePG 64-28 M
ModifiedYes Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2020-09-28-39
DIME Test ID: 2020-09-28-39-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2020-10-08
Test Results

Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 10/07/2020
Final Reading from the testing machine (X): 3 cm
% Elongation Recovery: 85 %
General comments (publicly viewable) (Max 250 characters): per 2018 standard specs

Test was verified on 10/08/2020