Summary for Test 2020-08-14-34-1
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 214658 DEA: 051K7104 EFIS: 0518000232 |
---|---|
DIST-CO-RTE-PM | 05-SLO-46,101-var |
Award Date | 04/28/2020 |
Closeout Date | 08/23/2021 |
Work Description | PLACE METHACRYLATE DECK SEAL, POLYESTER CONCRETE OVERLAY, JOINT SEALS |
Location Description | SAN LUIS OBISPO COUNTY IN AND NEAR PASO ROBLES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 02/20/2020) |
Sample Information
Sample Taken Date | 08/14/2020 | Sample Unique Key | 34 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/09/2020 |
Sample type | Verification | A brief description of the sample | Bag of Belt Cut |
The quantity of what the sample constitutes | One JMF Verification | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Mike | Last name of sampler or witnessed by | Savage |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | SPM Templeton | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | SPM Avenal |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2020-08-14-34
DIME Test ID: 2020-08-14-34-1
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-09-25
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Daniel Gingras
Date of test: 09/23/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99.3 %
Cumulative percent passing the 3/8 in. sieve: 95 %
Cumulative percent passing the #4 sieve: 75.6 %
Cumulative percent passing the #8 sieve: 60.9 %
Cumulative percent passing the #16 sieve: 46.5 %
Cumulative percent passing the #30 sieve: 35.1 %
Cumulative percent passing the #50 sieve: 23.7 %
Cumulative percent passing the #100 sieve: 14.4 %
Cumulative percent passing the #200 sieve: 9.3 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/25/2020 ✔