Summary for Test 2020-07-07-18-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 214689 DEA: 051M0204 |
---|---|
DIST-CO-RTE-PM | 05-SBT-129-0.3/R2.6 |
Award Date | 04/02/2020 |
Closeout Date | 10/29/2020 |
Work Description | COLD PLANE AND OVERLAY EXISTING ROADWAY WITH RHMA-G. |
Location Description | SAN BENITO COUNTY ABOUT 10 MILES EAST OF WATSONVILLE FROM 0.1 MILE WEST OF SCHOOL ROAD TO 0.1 MILE EAST OF ROUTE 101/129 SEPARATION |
QA Service Level | 1 (Verified on 02/20/2020) |
Sample Information
Sample Taken Date | 07/07/2020 | Sample Unique Key | 18 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/17/2020 |
Sample type | Acceptance | A brief description of the sample | TEST Asphalt Binder |
The quantity of what the sample constitutes | 1 can, #1 TEST (972751) | From where was the sample collected | Source |
First name of sampler or witnessed by | I | Last name of sampler or witnessed by | Vazquez |
Title of sampler | QC | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Unknown | Transportation Laboratory (TL) Number | 972751 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | Not set | |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-07-07-18
DIME Test ID: 2020-07-07-18-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-09-23
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Eva Torres
Date of test: 07/31/2020
Any material loss from containers during heating process/testing?: no data
Mass of empty container #1: 177.646 grams
Mass of container #1 before test (m1i): 212.738 grams
Mass of container #1 after test (m1f): 212.664 grams
Average mass change: -0.211 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/23/2020 ✔