Summary for Test 2020-09-17-14-4

Test performed: CTM 301-March 2000

Project Information

Project IdentifiersProject ID: 212777
DEA: 021H1104
EFIS: 0215000106
DIST-CO-RTE-PM02-LAS-299-25.58/25.58
Award Date12/04/2019
Closeout Date08/14/2023
Work DescriptionBUILDING WORK.
Location DescriptionLASSEN COUNTY ABOUT 11 MILES EAST OF BIEBER AT THE ADIN MAINTENANCE STATION
QA Service Level1 (Verified on 01/08/2019)

Sample Information

Sample Taken Date09/17/2020 Sample Unique Key14
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/17/2020
Sample typeAcceptance A brief description of the sampleClass 2 Aggregate Base
The quantity of what the sample constitutesnot identified From where was the sample collectedJob Site
First name of sampler or witnessed byCindy Last name of sampler or witnessed byBryant
Title of sampler Telephone number of sampler
Laboratory sample identificationD78627 Linked DIME Sample ID
The fabricator/manufacturer/facility nameEagle Peak Rock and Paving Transportation Laboratory (TL) Number853450
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-25-0029
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedWindrow Adin Maintenance Station
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2020-09-17-14
DIME Test ID: 2020-09-17-14-4
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2020-09-23

Test Results


How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 09/19/2020
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 in. sieve: 100 %
As Received Gradation, Percent Passing 3/4 in. sieve: 98 %
As Received Gradation, Percent Passing 1/2 in. sieve: 72 %
As Received Gradation, Percent Passing 3/8 in. sieve: 61 %
As Received Gradation, Percent Passing #4 sieve: 49 %
As Received Gradation, Percent Passing #8 sieve: 36 %
As Received Gradation, Percent Passing #16 sieve: 23 %
As Received Gradation, Percent Passing #30 sieve: 16 %
As Received Gradation, Percent Passing #50 sieve: 11 %
As Received Gradation, Percent Passing #100 sieve: 8 %
As Received Gradation, Percent Passing #200 sieve: 7 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 73 %
As Used Gradation, Percent Passing 3/8 in. sieve: 62 %
As Used Gradation, Percent Passing #4 sieve: 50 %
As Used Gradation, Percent Passing #8 sieve: 37 %
As Used Gradation, Percent Passing #16 sieve: 23 %
As Used Gradation, Percent Passing #30 sieve: 16 %
As Used Gradation, Percent Passing #50 sieve: 11 %
As Used Gradation, Percent Passing #100 sieve: 8 %
As Used Gradation, Percent Passing #200 sieve: 7 %
R value: 80
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/23/2020