Summary for Test 2020-08-12-21-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 214801 DEA: 031G6504 EFIS: 0319000105 |
---|---|
DIST-CO-RTE-PM | 03-PLA,NEV-89-21.5/21.6,0.0/0.5 |
Award Date | 05/07/2020 |
Closeout Date | 03/16/2021 |
Work Description | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). |
Location Description | PLACER AND NEVADA COUNTIES IN AND NEAR TRUCKEE FROM WEST RIVER STREET TO 0.2 MILE NORTH OF DEERFIELD DRIVE |
QA Service Level | 1 (Verified on 03/24/2020) |
Sample Information
Sample Taken Date | 08/12/2020 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/01/2020 |
Sample type | Acceptance | A brief description of the sample | AB PG 64-28 #1 test, #2(766410), #3(766411), #4(766412) No Test |
The quantity of what the sample constitutes | 1 Can | From where was the sample collected | Source |
First name of sampler or witnessed by | tiechert | Last name of sampler or witnessed by | mortis |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | western marathon | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-28 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | Not set | |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-08-12-21
DIME Test ID: 2020-08-12-21-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-09-25
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 09/03/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 156.680 grams
Mass of container #1 before test (m1i): 191.410 grams
Mass of container #1 after test (m1f): 191.190 grams
Average mass change: -0.633 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/25/2020 ✔