Summary for Test 2020-08-03-36-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 214190 DEA: 024G41U4 EFIS: 0218000047 |
---|---|
DIST-CO-RTE-PM | 02-SIS,SIS-5-Var |
Award Date | 08/26/2019 |
Closeout Date | 11/24/2021 |
Work Description | REPLACE REINFORCED CONCRETE BRIDGES & CONSTRUCT RETAINING WALL. |
Location Description | SHASTA AND SISKIYOU COUNTIES ABOUT 7 MILES NORTH OF POLLARD FLAT FROM 0.8 MILE SOUTH TO 0.7 MILE NORTH OF SIMS ROAD UNDERCROSSING AND FROM 0.6 MILE SOUTH OF CASTLE CRAGS DRIVE UNDERCROSSING TO 0.2 MILE SOUTH OF SOUTH DUNSMUIR UNDERCROSSING |
QA Service Level | 1 (Verified on 07/09/2019) |
Sample Information
Sample Taken Date | 08/03/2020 | Sample Unique Key | 36 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/05/2020 |
Sample type | Acceptance | A brief description of the sample | PG 58-34M #1 test |
The quantity of what the sample constitutes | 1 Can | From where was the sample collected | Source |
First name of sampler or witnessed by | JF | Last name of sampler or witnessed by | shea |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Valero Benicia | Transportation Laboratory (TL) Number | 896007 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | Not set | |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-08-03-36
DIME Test ID: 2020-08-03-36-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-09-22
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 09/10/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 176.450 grams
Mass of container #1 before test (m1i): 211.270 grams
Mass of container #1 after test (m1f): 210.950 grams
Average mass change: -0.919 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/22/2020 ✔