Summary for Test 2020-08-29-5-1
Test performed: ASTM D217-16Project Information
Project Identifiers | Project ID: 212324 DEA: 033F5104 EFIS: 0313000020 |
---|---|
DIST-CO-RTE-PM | 03-YUB-20-R18.1/R20.1 |
Award Date | 10/31/2019 |
Closeout Date | 08/03/2023 |
Work Description | Construct bridge, realign curve & widen shoulders. |
Location Description | Construction on state highway in Yuba County near Smartsville from the Yuba River Bridge to 0.3 mile east of Smartsville Road. |
QA Service Level | 1 (Verified on 02/27/2020) |
Sample Information
Sample Taken Date | 08/29/2020 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/01/2020 |
Sample type | Acceptance | A brief description of the sample | #1 TEST |
The quantity of what the sample constitutes | 2 CANs PG 64-16 | From where was the sample collected | Source |
First name of sampler or witnessed by | E | Last name of sampler or witnessed by | Chavez |
Title of sampler | MATL | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Western Refining | Transportation Laboratory (TL) Number | 766366 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
---|---|---|---|
Performance Grade | PG 64-16 | Lot number | |
Sublot number | Asphalt Rubber Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-08-29-5
DIME Test ID: 2020-08-29-5-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Test Release Date: 2020-09-11
Test Results
Determination: Worked Penetration
Input Type: Measured
Tester's full name: Minoo Ahmadi
Date of test: 09/10/2020
Worked Penetration, Test 1: 28 0.1 mm
Worked Penetration, Test 2: 25 0.1 mm
Worked Penetration, Test 3: 25 0.1 mm
Worked Penetration: 26 0.1 mm
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/11/2020 ✔