Test 2020-09-02-9-1 (AASHTO T308-10) Summary

Project Information
Project IdentifiersProject ID: 214605
DEA: 051K7904
EFIS: 0519000026
DIST-CO-RTE-PM05-SB-166-R51.1/55.0
Work DescriptionCOLD IN-PLACE RECYCLING AND RHMA OVERLAY.
Location DescriptionSANTA BARBARA COUNTY ABOUT 10 MILES WEST OF NEW CUYAMA FROM CUYAMA RIVER BRIDGE TO 3.1 MILES EAST OF COTTONWOOD CANYON ROAD
Sample Information
Sample Taken Date9/2/2020 Sample Unique Key9
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing9/4/2020
Sample typeAcceptance A brief description of the sample3/4" RHMA-G w/LSM
The quantity of what the sample constitutes4 boxes From where was the sample collectedManufacturer
First name of sampler or witnessed byMark Last name of sampler or witnessed byBennett
Title of sampler Laboratory sample identification20-A-217
The fabricator/manufacturer/facility nameCal Portland Garey Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading3/4 inch Lot number1
Sublot number8 HMA Design ID
Test Details
DIME Sample ID: 2020-09-02-9
DIME Test ID: 2020-09-02-9-1
Testing Lab: CT D05 - Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Test Release Date: 2020-09-10
Test Results

Input Type: Calculated
Tester's full name: Eric Atkins
Date of test: 09/09/2020
Correction Factor (Percent by mass of HMA Specimen): no data %
Asphalt Binder Content:7.83 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 09/10/2020