Summary for Test 2020-08-17-26-4

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 214388
DEA: 051F6804
EFIS: 0514000046
DIST-CO-RTE-PM05-MON-1-39.8/74.6
Award Date11/05/2019
Closeout Date08/17/2022
Work DescriptionRHMA OVERLAY ON EXISTING ROADWAY AND REPLACE GUARDRAIL.
Location DescriptionMONTEREY COUNTY FROM TORRE CANYON BRIDGE NEAR BIG SUR TO SAN LUIS AVENUE IN CARMEL
QA Service Level1 (Verified on 09/06/2019)

Sample Information

Sample Taken Date08/17/2020 Sample Unique Key26
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/27/2020
Sample typeVerification A brief description of the sampleBags of Aggregate
The quantity of what the sample constitutesOne JMF Renewal From where was the sample collectedManufacturer
First name of sampler or witnessed byJ Last name of sampler or witnessed byGomez
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGraniterock Aromas Batch Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-35-0012::A.R. WILSON QUARRY
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedAt the Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2020-08-17-26
DIME Test ID: 2020-08-17-26-4
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2020-08-31

Test Results


How many times will the test be run?: Once
Input Type: Calculated
Tester's full name: Field Lab
Date of test: 08/18/2020
Sand Equivalent: 77
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/31/2020