Test 2020-06-11-52-1 (AASHTO T275-07r12) Summary

Project Information
Project IdentifiersProject ID: 210837
DEA: 080J0804
EFIS: 0800000283
COOP: 081625
DIST-CO-RTE-PM08-RIV-15-34.7/51.6
Work Description(Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT
Location DescriptionRiverside County and SBD-15-0.0/1.3
Sample Information
Sample Taken Date6/11/2020 Sample Unique Key52
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing7/8/2020
Sample typeQuality Assurance A brief description of the sampleRWMA-G 3/4" PG64-16RB
The quantity of what the sample constitutes2 box, 2 Core From where was the sample collectedManufacturer
First name of sampler or witnessed byQC Last name of sampler or witnessed byQC
Title of sampler Laboratory sample identification
The fabricator/manufacturer/facility nameRJ Noble Orange Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading3/4 inch Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2020-06-11-52
DIME Test ID: 2020-06-11-52-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity)
Test Release Date: 2020-07-15
Test Results

Number of tests: 2
What test procedure is performed?: Method B
Input Type: Calculated
Tester's full name: E. Jabbour
Date of test: 07/14/2020
Bulk Specific Gravity:2.262
Bulk Specific Gravity 2:2.297
Average Bulk Specific Gravity:2.28
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 07/15/2020