Summary for Test 2020-06-11-45-6

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 212302
DEA: 080C70U4
EFIS: 0815000189
COOP: 081646
DIST-CO-RTE-PM08-SBD-210-PM R 25
Award Date11/06/2019
Closeout DateNot set
Work DescriptionThe SR 210 Base Line Interchange project, in the City of Highland, includes widening of the Base Line overcrossing at the SR 210, along with additional ramp widening improvements for the northbound on-ramp, northbound off-ramp and southbound on-ramps.
Location DescriptionSR210 Lane Addition work proposes to improve SR 210 within the cities of Highland, Redlands, San Bernardino and unincorporated sections of San Bernardino County,
QA Service Level2 (Verified on 01/15/2020)

Sample Information

Sample Taken Date06/11/2020 Sample Unique Key45
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/02/2020
Sample typeVerification A brief description of the sample1/2" RMHA-G-SP Aggregate
The quantity of what the sample constitutesJMF 4 Bags coldfeed aggregate From where was the sample collectedManufacturer
First name of sampler or witnessed byAll American Asphalt Corona Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification0399G-20 Linked DIME Sample ID
The fabricator/manufacturer/facility nameAll American Asphalt Corona Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-33-0005
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant number106836 A detailed description of where the material sample was collectedBelt Cut at All American Asphalt Corona Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size1/2 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2020-06-11-45
DIME Test ID: 2020-06-11-45-6
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2020-07-16

Test Results


How many times will the test be run?: 3 Times
Input Type: Measured
Tester's full name: Satish Jain
Date of test: 07/11/2020
Clay Level (Test 1): 6
Sand Level (Test 1): 4.6
Clay Level (Test 2): 4.4
Sand Level (Test 2): 3.4
Clay Level (Test 3): 5.3
Sand Level (Test 3): 4.3
Sand Equivalent (Test 1): 77
Sand Equivalent (Test 2): 78
Sand Equivalent (Test 3): 82
Sand Equivalent: 79
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/16/2020