Summary for Test 2020-05-20-42-3

Test performed: CTM 301-March 2000

Project Information

Project IdentifiersProject ID: 214250
DEA: 021H3204
EFIS: 0215000126
DIST-CO-RTE-PM02-TEH-99-12.0/12.6
Award Date10/09/2019
Closeout Date11/01/2021
Work DescriptionCONSTRUCT CURB RAMPS AND SIDEWALKS.
Location DescriptionTEHAMA COUNTY AT LOS MOLINOS FROM JOSEPHINE STREET TO LOS MOLINOS CREEK BRIDGE
QA Service Level1 (Verified on 07/22/2019)

Sample Information

Sample Taken Date05/20/2020 Sample Unique Key42
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/20/2020
Sample typeAcceptance A brief description of the sample3/4" Class II AB
The quantity of what the sample constitutesnot provided From where was the sample collectedManufacturer
First name of sampler or witnessed byCindy Last name of sampler or witnessed byBryant
Title of sampler Telephone number of sampler
Laboratory sample identificationD78436 Linked DIME Sample ID
The fabricator/manufacturer/facility nameTullis inc Transportation Laboratory (TL) Number853459
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-45-0061
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile @ Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2020-05-20-42
DIME Test ID: 2020-05-20-42-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2020-07-14

Test Results


How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: TRM
Date of test: 05/20/2020
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 in. sieve: 100 %
As Received Gradation, Percent Passing 3/4 in. sieve: 97 %
As Received Gradation, Percent Passing 1/2 in. sieve: 73 %
As Received Gradation, Percent Passing 3/8 in. sieve: 61 %
As Received Gradation, Percent Passing #4 sieve: 41 %
As Received Gradation, Percent Passing #8 sieve: 29 %
As Received Gradation, Percent Passing #16 sieve: 21 %
As Received Gradation, Percent Passing #30 sieve: 15 %
As Received Gradation, Percent Passing #50 sieve: 9 %
As Received Gradation, Percent Passing #100 sieve: 6 %
As Received Gradation, Percent Passing #200 sieve: 5 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 75 %
As Used Gradation, Percent Passing 3/8 in. sieve: 62 %
As Used Gradation, Percent Passing #4 sieve: 42 %
As Used Gradation, Percent Passing #8 sieve: 30 %
As Used Gradation, Percent Passing #16 sieve: 22 %
As Used Gradation, Percent Passing #30 sieve: 15 %
As Used Gradation, Percent Passing #50 sieve: 9 %
As Used Gradation, Percent Passing #100 sieve: 6 %
As Used Gradation, Percent Passing #200 sieve: 5 %
R value: 79
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/14/2020