Summary for Test 2014-11-26-2-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 3958
DEA: 07215914
EFIS: 0700001831
DIST-CO-RTE-PM07-LA-5-1.2/2.1
Award Date12/31/1969
Closeout Date06/14/2016
Work DescriptionWIDEN AND REALIGN FREEWAY AND RECONSTRUCT OVERCROSSING STRUCTURE.
Location DescriptionLOS ANGELES COUNTY IN SANTA FE SPRINGS FROM 0.3 MILE SOUTH OF NORTH FORK COYOTE CREEK BRIDGE TO 0.3 MILE NORTH OF MARQUARDT AVENUE AND AT NORWALK HUB AND LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER
QA Service Level1 (Verified on 05/01/2012)

Sample Information

Sample Taken Date11/26/2014 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/04/2014
Sample typeAcceptance A brief description of the sampleBackfill material
The quantity of what the sample constitutes2 Bags From where was the sample collectedOther
First name of sampler or witnessed byJose Last name of sampler or witnessed byBurbano
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identification4315B Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameBr 53 3037 Abut 1 Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleUnknown
The fabricator/manufacturer designation for the sampleUnknown A detailed description of where the material sample was collectedBr 53 3037 Abut 1
Where the material sample would have been placed if not sampledUnknown

Test Details

DIME Sample ID: 2014-11-26-2
DIME Test ID: 2014-11-26-2-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2015-02-20

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Vance Olsen
Date of test: 12/12/2014
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 99 %
Cumulative percent passing the 3/4 in. sieve: 98 %
Cumulative percent passing the 1/2 in. sieve: 95 %
Cumulative percent passing the 3/8 in. sieve: 94 %
Cumulative percent passing the #4 sieve: 88 %
Cumulative percent passing the #8 sieve: 85 %
Cumulative percent passing the #16 sieve: 83 %
Cumulative percent passing the #30 sieve: 77 %
Cumulative percent passing the #50 sieve: 62 %
Cumulative percent passing the #100 sieve: 42 %
Cumulative percent passing the #200 sieve: 24.6 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/20/2015