Summary for Test 2020-06-10-23-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 212866 DEA: 021H9704 EFIS: 0216000051 |
---|---|
DIST-CO-RTE-PM | 02-TEH-36-12.6/13.1 |
Award Date | 11/25/2019 |
Closeout Date | 10/06/2020 |
Work Description | CURVE REALIGNMENT AND HMA PAVING. |
Location Description | TEHAMA COUNTY ABOUT 16 MILES EAST OF PLATINA FROM 2.3 MILES EAST TO 2.8 MILES EAST OF DRY CREEK BRIDGE |
QA Service Level | 1 (Verified on 01/08/2019) |
Sample Information
Sample Taken Date | 06/10/2020 | Sample Unique Key | 23 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/23/2020 |
Sample type | Acceptance | A brief description of the sample | TEST Asphalt Binder |
The quantity of what the sample constitutes | 2 cans, #1 test, No Test #2(Unknown) | From where was the sample collected | Source |
First name of sampler or witnessed by | D | Last name of sampler or witnessed by | Lockett |
Title of sampler | Consultant | Telephone number of sampler | |
Laboratory sample identification | AB206057 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Valero - Benicia | Transportation Laboratory (TL) Number | 736620 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | Not set | |
Time of sample | Not set | HMA Supplier | Not set |
Certified Asphalt Supplier | Not set | Multigrade | Not set |
Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2020-06-10-23
DIME Test ID: 2020-06-10-23-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-07-01
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Juan Gomez
Date of test: 07/01/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 171.420 grams
Mass of container #1 before test (m1i): 206.950 grams
Mass of container #1 after test (m1f): 206.620 grams
Average mass change: -0.929 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/1/2020 ✔