Test 2020-03-12-22-1 (CTM 202-November 2011) Summary

Project Information
Project IdentifiersProject ID: 66666
DEA: APP
EFIS: 0019000052
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680.
Location DescriptionNot set
Sample Information
Sample Taken Date3/12/2020 Sample Unique Key22
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testingNot set
Sample typeAggregate Prequalification Program A brief description of the sample1 x 4 PCC Aggregate
The quantity of what the sample constitutes4 Bags From where was the sample collectedSource
First name of sampler or witnessed byMarc Last name of sampler or witnessed bySegura
Title of sampler Laboratory sample identification9536
The fabricator/manufacturer/facility nameCemex Lytle Creek Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeAggregate Source Identification (SMARA or name of Pit)91-36-0040
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStockpile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number Lot number
Sublot number HMA Design ID
Test Details
DIME Sample ID: 2020-03-12-22
DIME Test ID: 2020-03-12-22-1
Testing Lab: CT HQ - Sacramento Aggregate Testing Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2020-06-30
Test Results

What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Ryan Kester
Date of test: 04/21/2020
Cumulative percent passing the 1 1/2 in. sieve:100 %
Cumulative percent passing the 1 in. sieve:98 %
Cumulative percent passing the 3/4 in. sieve:75 %
Cumulative percent passing the 1/2 in. sieve:31 %
Cumulative percent passing the 3/8 in. sieve:9 %
Cumulative percent passing the #4 sieve:2 %
Cumulative percent passing the #8 sieve:1.5 %
General comments (publicly viewable) (Max 250 characters):

Test was verified on 06/30/2020