Summary for Test 2020-04-15-18-4

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 214322
DEA: 021H74U4
EFIS: 0218000043
DIST-CO-RTE-PM02-TEH-36-87.8/89.1
Award Date10/11/2019
Closeout Date09/23/2020
Work DescriptionCURVE REALIGNMENT AND EXTENDING THE TRUCK CLIMBING LANE.
Location DescriptionTEHAMA COUNTY NEAR MINERAL FROM 0.1 MILE TO 1.5 MILES EAST OF ROUTE 89
QA Service Level1 (Verified on 09/16/2019)

Sample Information

Sample Taken Date04/15/2020 Sample Unique Key18
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/15/2020
Sample typeVerification A brief description of the sampleCombined RAP (5/8" Minus)
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byCindy Last name of sampler or witnessed byBryant
Title of sampler Telephone number of sampler
Laboratory sample identificationD78385B Linked DIME Sample ID
The fabricator/manufacturer/facility nameOrland Plant Transportation Laboratory (TL) Number853430
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceKRC Orland
Aggregate Size1/2-inch Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2020-04-15-18
DIME Test ID: 2020-04-15-18-4
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-06-04

Test Results


Does this test use 1/4 sieve?: Yes
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: NRML-R
Date of test: 04/17/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 92.9 %
Cumulative percent passing the 3/8 in. sieve: 86.8 %
Cumulative percent passing the 1/4 in. sieve: 72.1 %
Cumulative percent passing the #4 sieve: 63.5 %
Cumulative percent passing the #8 sieve: 46.6 %
Cumulative percent passing the #16 sieve: 34.6 %
Cumulative percent passing the #30 sieve: 25.8 %
Cumulative percent passing the #50 sieve: 17.7 %
Cumulative percent passing the #100 sieve: 12.1 %
Cumulative percent passing the #200 sieve: 7.3 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/4/2020