Summary for Test 2020-05-13-19-1

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 214756
DEA: 050N7AU4
EFIS: 0520000030
DIST-CO-RTE-PM05-SB-101-1.4/4.8
Award DateNot set
Closeout Date09/27/2022
Work DescriptionSegment 4A - Carpinteria: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, epoxy coated rebar, precast box culverts, precast RCP.
Location DescriptionCARPINTERIA FROM 0.2 MILE SOUTH OF BAILARD AVENUE OVERCROSSING TO 0.7 MILE SOUTH OF SOUTH PADARO LANE
QA Service Level1 (Verified on 03/09/2020)

Sample Information

Sample Taken Date05/13/2020 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/15/2020
Sample typeAcceptance A brief description of the sampleBag of RAP
The quantity of what the sample constitutesRAP From where was the sample collectedManufacturer
First name of sampler or witnessed byTom Last name of sampler or witnessed byCromwell
Title of sampler Telephone number of sampler
Laboratory sample identificationD5 20-A-032 Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Santa Paula Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceGranite Santa Paula
Aggregate SizeUnknown Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2020-05-13-19
DIME Test ID: 2020-05-13-19-1
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-05-21

Test Results


Does this test use 1/4 sieve?: Yes
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Daniel Gingras
Date of test: 05/21/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 97 %
Cumulative percent passing the 1/4 in. sieve: 0 %
Cumulative percent passing the #4 sieve: 69 %
Cumulative percent passing the #8 sieve: 54 %
Cumulative percent passing the #16 sieve: 40 %
Cumulative percent passing the #30 sieve: 28 %
Cumulative percent passing the #50 sieve: 20 %
Cumulative percent passing the #100 sieve: 14 %
Cumulative percent passing the #200 sieve: 9.1 %
General comments (publicly viewable) (Max 1000 characters): RAP sampled with Lot 1-8 on May 13th (received by lab May 15th).

Test was verified on 5/21/2020