Summary for Test 2020-04-21-28-3

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 214253
DEA: 051J0404
EFIS: 0517000054
DIST-CO-RTE-PM05-SLO,MON-46,101-49.5,R3.1/R5.2
Award Date11/01/2019
Closeout Date09/25/2020
Work DescriptionINSTALL ELECTRIC VEHICLE CHARGING STATIONS.
Location DescriptionSAN LUIS OBISPO AND MONTEREY COUNTIES ON ROUTE 46 AT SHANDON SAFETY ROADSIDE REST AREA AND ON ROUTE 101 AT CAMP ROBERTS SAFETY ROADSIDE REST AREAS
QA Service Level1 (Verified on 09/06/2019)

Sample Information

Sample Taken Date04/21/2020 Sample Unique Key28
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/29/2020
Sample typeVerification A brief description of the sampleBag of RAP
The quantity of what the sample constitutesOne JMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byBrandon Last name of sampler or witnessed byWood
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalPortland Paso Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceCalPortland Paso
Aggregate SizeUnknown Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2020-04-21-28
DIME Test ID: 2020-04-21-28-3
Testing Lab: CT D05 - San Luis Obispo District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2020-05-15

Test Results


Does this test use 1/4 sieve?: Yes
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Daniel Gingras
Date of test: 04/30/2020
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97.3 %
Cumulative percent passing the 3/8 in. sieve: 86 %
Cumulative percent passing the 1/4 in. sieve: 0 %
Cumulative percent passing the #4 sieve: 55.1 %
Cumulative percent passing the #8 sieve: 39.7 %
Cumulative percent passing the #16 sieve: 29.5 %
Cumulative percent passing the #30 sieve: 21.1 %
Cumulative percent passing the #50 sieve: 14.4 %
Cumulative percent passing the #100 sieve: 9.3 %
Cumulative percent passing the #200 sieve: 5.9 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/15/2020