Summary for Test 2020-05-05-4-2

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 211848
DEA: 112T2174
EFIS: 1116000131
DIST-CO-RTE-PM11-SD-5-R37.4 - R46.5
Award Date12/22/2016
Closeout DateNot set
Work Description(Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave.
Location DescriptionIN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING
QA Service Level1 (Verified on 01/31/2017)

Sample Information

Sample Taken Date05/05/2020 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing05/15/2020
Sample typeQuality Assurance A brief description of the sampleCouplers
The quantity of what the sample constitutes128 pcs From where was the sample collectedFabricator
First name of sampler or witnessed bymike Last name of sampler or witnessed byKopenski
Title of samplerQA Telephone number of sampler3107459655
Laboratory sample identificationL149-050-20 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Rebar HRC Transportation Laboratory (TL) NumberL149-050-20
Inspector Lot Number from the Transportation Laboratory (TL) FormL149-050-20 Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC Steel California
Coupler ManufacturerHRC Intermediate Assembler or FabricatorUnknown
Rebar Size#5 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)J5558U, A190833 Rebar Heat Number(s)3094590
Rebar Size 2 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2020-05-05-4
DIME Test ID: 2020-05-05-4-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2020-05-19

Test Results


Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 05/15/2020
UTM: 400kip
Temperature: 72.00 f
Halo ID:
NumSampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12No. 5/16mm100.313007497013Ok Neckingbewing

General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.

Test was verified on 5/19/2020